“I was introduced to Sterling (Steve Day) in early 2011 thru a vendor when T&G were in urgent need of engineering project support and guidance for the new Pomona Facility. Sterling provided overall project guidance that enabled the entire operation to be relocated from the Rancho Dominquez facility to Pomona in 3 well orchestrated weekends. It should be noted that this was coordinated without disturbing our production or shipping schedules. Sterling also provided project engineering, design and construction management for the new roaster systems, foreign material sorter and new packaging areas that resulted in timely, well planned installations.”
” After leaving T&G for Caro Nut, I recommended Sterling to be selected for the primary consultant to design & build the new Caro Nut Facility. Under Sterling’s guidance, effective planning and execution the 75k sq. ft facility was completed in 5 months and are now currently in production. Steve Day is a seasoned professional and a pleasure to work with, I have worked with several consultants in the past and Sterling was my first consideration for this project. He is an excellent problem solver and his network of resources was invaluable. Thank you, Sterling!”